Lead Adventure Forum
Miniatures Adventure => Other Adventures => Topic started by: levenminiatures on 19 May 2014, 01:02:51 PM
-
So last week, I released a couple of culvert bridges which had been sitting on my bench for a few weeks.
The first, BRI06 is a small culvert bridge designed to span water of 21mm wide.
(http://www.levenminiatures.co.uk/images/6mm/bridges/6mm%20culvert%20bridge.jpg)
The second is BRI07 which is a twin arched stone bridge built to span water up to 55mm wide.
(http://www.levenminiatures.co.uk/images/6mm/bridges/6mm%20double%20arch%20bridge.jpg)
and this week, I have finally released the first of four German airfield buildings. This one (MIL13c) is a hangar with a footprint of 118 x 76mm and stands 29mm high, the front opening is 77m wide and 20mm high and has been made without doors so most of the doorway can be cut out if required.
(http://www.levenminiatures.co.uk/images/6mm/military/Luftwaffe%20Hangar.jpg)
check out my other 6mm scenics at http://www.levenminiatures.co.uk/
-
Lovely stuff as usual although not my scale :'(
-
Interesting!It would be lovely to see some more detailed photos of the stonework! in 6mm should be quite interesting to see!
-
(http://www.levenminiatures.co.uk/20140519_145924%20bw.jpg)
how's that Sangennaru? best I can do
-
Seems pretty great! did you sculpt the stonework yourself on a panel for further uses? =)