Quite a bit of work went into it this past week. The roof is completed; doll house cedar shakes, split into halves and thirds- very tedious work
. The dormer was an after thought and it shows in the carpentry
:
I added a small loft. There should be more of it but then there would have been even more issues using it as a playing piece:
The thing is kind of a beast; I'd include a figure for scale but it is a bit embarrassing. I guess it's not really fantasy though unless it has massive over sized features though
:
Tomorrow I have to:
- - add small rubble and rock to the lower floor
- - add daub to the walls that don't have it
- - add a few more details
Ready for primer Tuesday, 12 days to paint.
Edit: actually, 11 days to paint I guess as the closing time is midnight, Mar 9th, GMT not local time...