I echo the others' sentiments...well done!
Thank you,
Over last weekend and today I have managed to finish two more buildings.
These are the other side of Rue Currie. There is three main buildings with a garage at the end.
The corner shop that sits at the start of Rue Currie and the High street (WIP for painting), the smaller house (being painted now), the larger house (shown bellow) and garage building (shown bellow)
The small garage at the end of this street. This building will have pallets, barrels boxes etc inside it. all of which will be 3d printed as well.
back
inside
Larger House, split over two different levels with no access between.
Back
Inside ground
Inside first or second home.