Photo update:

A few details to add before priming but mostly done.

Canvas roof comes off for access, mast comes off for storage. Again a few details to finish before priming

Trading post drop-in furniture. Will paint up before adding goods to shelving. And inside the outpost:


An alternate drop-in furniture piece; the tropical bar. Lots of small details to add once painted plus 4 tables to make.

]
Halfway through building a small tropical cabin.

Designed to fit against the dock sections.

Some crates from wood blocks and coffee stir sticks.

Removable altar piece for a temple. Built entirely from 1/4inch hardboard scraps.
Thanks for looking.