I had a few unexpected days off work which gave me time to work on the build.
As you can see from the pics the roof is on and tiled, the yard is paved and the yard wall is up. That's pretty much the main structure complete and now it's down to the fiddly detailing, filling and weathering. There's a lot to do but with things at work winding down for Crimbo I'll have the time.
For the tiles I used card tile sheets from Jimbibbly's Oshiro Terrain. They're easy to work with and produce a slightly uneven look that fits the part.

